19.5.9.7 Final As-Built Survey & Surveyor’s Report
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. The as-built Survey and the Surveyor’s Report must show that the most recent field work was made, or last updated, no more than 120 days prior to final closing. The survey must be prepared, signed, and sealed by a licensed surveyor and include the certification required by the HUD Survey Instructions and Surveyor’s Report (form HUD-91073M).
Continue researching
Related topics
State and federal sources. Edit the document title or filters, then run your search.
Get a plain-English answer with a citation back to this text.
Ask AI about this code