6.7.3 Recording Baseline Data-CNA
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. The Lender’s cost analyst will prepare a CNA in the CNA e-Tool reporting future repair and replacement needs only. No utility consumption data for individual components is required. The cost analyst should
MAP Guide, March 2021 Go to beginning of Chapter 6
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Chapter 6 Page 6-13
To return to this page after clicking a link, press ALT + Back Arrow
Chapter 6 Energy and Water Conservation 6.8 Green MIP Requirements for Section 241(a)
Go to Table of Contents
obtain the HUD Custom SEDI (an excel spreadsheet) and attach it to the CNA in the CNA e-Tool. This will automatically record the expected ENERGY STAR® Score as well as the related Energy Use Intensity (BTUs per square foot). In the event that EPA revises or recalibrates the multifamily ENERGY STAR® Score resulting in a property reporting an annual continuing performance less than the minimum 75, the Energy Use Intensity reported with the application will become the minimum performance requirement.
Get a plain-English answer with a citation back to this text.
Ask AI about this code