Skip to content

19.5.7.1 Introduction

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. Generally, off-site construction is non-mortgageable and not included in the Construction Contract. See Chapter 5, Section 5.11 and Appendix 5, Section A.5.5. However, when building components are initially stored off-site but will be integrated on-site into the construction of the HUD-insured Project during the construction period, those components may be mortgageable, provided the program participants meet the requirements of this section and Appendix 12, Section A.12.2 and Section A.12.3.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.