Skip to content

7.17.1.4 Form HUD-92264T for Section 8 Project-Based Assistance without LIHTC

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

  • A. Enter the market rent by comparison on Line 1.

  • B. Enter Personal Benefit Expenses on Line 2.

  • C. Line 3 is Not Applicable.

  • D. Line 4 is Not Applicable.

  • E. Enter the Project Based Section 8 Contract Rent on Line 5.

  • F. Subtract Line 2 from Line 5 (if applicable).

  • G. Process using the lesser of Line 1 or Line 5.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.