12.4.3 Architect Administering the Construction Contract

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. The Architect administering the construction contract is responsible for reporting in writing the results of periodic visits to the construction site. The Architect's log should provide information regarding assessment of the progress of the work and a record of the actions taken to ensure that the work is being accomplished in the best interests of all the parties.

B. The American Institute of Architects (AIA) Document G711, Architect's Field Report, may be used for the log. A log of each visit should show, at a minimum, the following:

MAP Guide, March 2021 Go to beginning of Chapter 12

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Chapter 12 Page 12-12

To return to this page after clicking a link, press ALT + Back Arrow

Chapter 12 Construction Period 12.5 Architect’s Adequacy

Go to Table of Contents

  1. Date of inspection.

  2. HUD project identification and location.

  3. Time, weather, and temperature range.

  4. Estimated percent of completion.

  5. Work in progress and conformance with the contractor's progress schedule.

  6. Persons present at work site.

  7. Observations and items to verify.

  8. Information or action required.

  9. Firm name and signature.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.