9.4.4 Remediation Plans with Complete Removal of Contamination

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. Except for situations where Section 9.4.5 (Remediation Plans with Incomplete Removal of Contamination) applies, the Lender must submit a remediation plan designed to bring the contamination identified by a complete site characterization per Section 9.4.3.B.1 to LSTF unrestricted criteria levels, with no ongoing active or passive remediation. There must not be any need for engineering controls, institutional controls, or monitoring wells.

B. All of the requirements for Section 9.4.3 must be met.

C. A remediation plan that involves control of off-site contamination per Section 9.4.7 and/or Tier 4 vapor encroachment mitigation per Section 9.4.2.B.10 is not permitted under this section but may be allowed under Section 9.4.5.

MAP Guide, March 2021 Go to beginning of Chapter 9

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Chapter 9 Page 9-18

To return to this page after clicking a link, press ALT + Back Arrow

Chapter 9 Environmental Review and Requirements 9.4 Contamination and Toxic Substances

Go to Table of Contents

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.