19.5.10.2 Exceptions to General Rule
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. When the completion and installation of on-site facilities is adequately assured at the discretion of the RC Director, and the RC Director believes the Borrower will diligently pursue the completion of the onsite facilities, the RC Director may approve the final advance of mortgage Loan proceeds, if all of the following are true:
- All on-site sewer, water, electrical, and gas facilities are completely installed and connected.
MAP Guide, March 2021 Go to beginning of Chapter 19
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Chapter 19 Page 19-72
To return to this page after clicking a link, press ALT + Back Arrow
Chapter 19 Closing Guide 19.5 Additional Requirements for Insurance of Advances
Go to Table of Contents
Other on-site facilities such as streets, walks, curbs, and gutters are useable and safe, if incomplete, and all buildings have all weather vehicular and pedestrian access.
Adequate facilities for ingress and egress are provided.
Applicable escrow agreements are in force to assure the completion of the facilities.