5.5.1 New Construction and Substantial Rehabilitation
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. New construction and substantial rehabilitation projects require a General Contractor and the services of a Project Architect (See Section 5.3 above.) The contracts between the parties must be coordinated using the following forms:
MAP Guide, March 2021 Go to beginning of Chapter 5
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Chapter 5 Page 5-18
To return to this page after clicking a link, press ALT + Back Arrow
Chapter 5 Architectural and Construction Analysis 5.6 Streamlined Processing
Go to Table of Contents
Owner and General Contractor
- The construction contract between the owner and General Contractor shall be form HUD-92442M Construction Contract for Insured Advances:
- Form HUD-92442M, Construction Contract Lump Sum (Article 4 Option 2), may be used when there is no identity of interest between the Borrower and the contractor.
- Form HUD- 92442M, Construction Contract Cost Plus (Article 4 Option 1), may be used in any case, and shall be used when an identity of interest exists between the Borrower and contractor. A Builder’s Profit will not apply.
Form HUD-92554M Supplementary Conditions to the Contract for Construction must be attached.
AIA Document A201-2017 General Conditions of the Contract for Construction must be attached.
- HUD does not specify a form of construction contract for Insurance Upon Completion projects. However, some form of binding contract must be executed and submitted to HUD for review and approval.
- In addition, the Building and Loan Agreement between the Borrower and the Lender (form HUD92441M) must be used.
Get a plain-English answer with a citation back to this text.
Ask AI about this code