Skip to content

6.5.3 Delivery of ENERGY STAR® Existing Building Certification

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. The Existing Building Certification must be delivered with the application. It may not be deferred. The Firm Commitment may not be conditioned upon receipt or future delivery of the Existing Building Certification. A single exception is permitted if the Existing Building Certification cannot be obtained because the Borrower is unable to provide consumption data for twelve consecutive, whole months for every meter on the property, including any and all tenant meters. In this circumstance, the application must include a Statement of Energy Performance consistent with the benchmarking procedures described at Section 6.6.3.A.2 indicating that the property likely will achieve the minimum ENERGY STAR® Score after 100% whole building data is available. In addition, the Borrower must include as non-critical repairs the installation of energy consumption monitoring technology (as described at Section 6.4.5.A.2) to provide 100% whole building consumption data collection. If the Existing Building Certification is deferred, it must be delivered not more than 15 months after the completion of the non-critical repairs.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.