Skip to content

5.11.1 Supplemental Loan for New Construction

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. Section 5.3.2 requirements and instructions apply to Section 241(a) applications involving new construction, except as modified below:

  1. A CNA of the existing improvements at the property is required to identify deficiencies and repair needs as may exist in the existing improvements for which repairs and alterations must be included in the proposed scope of work. However, a single CNA e-Tool for the entire property must produce one RfR schedule of all the components, inclusive of future replacements at the existing improvements as well as for any proposed new structures and additions.

B. Processing requirements for new construction as described in Section 5.7 and Section 5.8 apply.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.