I. Operation and Maintenance Plans :

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

  1. An operation and maintenance plan (called an operation, maintenance and monitoring (OM+M) plan under the ANSI-AARST standards) must be administered in accordance with the applicable mitigation standard for any mitigation project. A condition shall be attached to the Firm Commitment requiring

MAP Guide, March 2021 Go to beginning of Chapter 9

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Chapter 9 Page 9-34

To return to this page after clicking a link, press ALT + Back Arrow

Chapter 9 Environmental Review and Requirements 9.6 Environmental Laws and Authorities

Go to Table of Contents

that the Borrower operate and maintain the property consistent with the referenced OM+M plan for the duration of the insured mortgage. The project must submit the final OM+M plan to HUD after the radon mitigation system is installed. Given the ongoing risk associated with radon, the OM+M requirement for maintaining mitigation systems must be implemented when a mitigation system is present on the property.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.