9.5.2.2 Architecture/Engineering and Cost
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. A construction analyst should review the cost estimate of the remediation plan to determine whether it is reasonable and if the remediation and removal contractor is appropriately bonded and qualified. Cost data for remediation is not as plentiful as with more routine construction tasks. The HUD construction analyst may consult with local environmental remediation professionals about costs for similar work.