9.6.21 Operation and Maintenance Plans
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. For projects that contain lead based paint (LBP) or asbestos, or have ongoing risks such as radon or contamination that may require permanent installation of ventilation, detection or alarm devices, the Borrower or Project Architect is responsible for engaging the services of qualified abatement contractor(s) as required by the relevant standard to prepare a scope of work for the abatement or mitigation. Where the scope of abatement work consists of permanent enclosure or encapsulation or ongoing monitoring, but not removal, a qualified consultant or abatement contractor(s) must also prepare, separate from the scope of abatement work, an Operations and Maintenance (O&M) Plan. The O&M Plan must describe ongoing maintenance procedures to be followed for as long as the hazard remains in place. All abatement work and ongoing maintenance activities for radon, LBP, asbestos, and/or any other hazards shall conform to the requirements described in this chapter. A condition shall be attached to the Firm Commitment requiring that the Borrower operate and maintain the property consistent with the referenced O&M plan(s) for the duration of the insured mortgage.
MAP Guide, March 2021 Go to beginning of Chapter 9
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Chapter 9 Page 9-58
To return to this page after clicking a link, press ALT + Back Arrow
Chapter 10 Management Analysis 10.1 Introduction
Go to Table of Contents
Get a plain-English answer with a citation back to this text.
Ask AI about this code