Skip to content

19.4.9.6 Equity Bridge Loans (EBL) for Tax Credit Projects

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. HUD will address requirements for EBL terms in the Firm Commitment. The EBL documents must meet the requirements of Chapter 14, Section 14.15, which must be memorialized in a rider attached to the EBL documents and reviewed and approved by the HUD Closing Attorney. See Section 19.16, Equity Bridge Loan Rider – LIHTC Projects.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.