18.3.10 Cost Certification
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. Cost certification is not required. As a condition of the Firm Commitment, HUD may require the borrower to produce information related to the cost and completion of Critical and Non-critical repairs and to provide appropriate documentation to HUD, including, at a minimum, invoices, receipts and photos, as repair funds are drawn from escrows. The need for site visits in connection with the completion of repairs or escrow draws will be determined by the Technical Branch Chief of the HUD office with jurisdiction over the property. Projects with minor repairs typically would require few, if any, site visits by HUD staff.
MAP Guide, March 2021 Go to beginning of Chapter 18
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Chapter 18 Page 18-6
To return to this page after clicking a link, press ALT + Back Arrow
Chapter 18 Section 223(a)(7) 18.3 Basic Program Requirements
Go to Table of Contents
Get a plain-English answer with a citation back to this text.
Ask AI about this code