4.4.3 Construction Period Responsibilities
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. Under MAP, HUD must approve the initial and final construction draws.
B. HUD will perform, contract, or otherwise provide for inspection duties and will provide copies of the Trip Report to the MAP Lender.
C. The MAP Lender will prepare and approve the documents required for the interim draws during construction.
D. HUD must approve the construction amount for each item in the initial and final advance and for each Change Order during construction.