5.10.6 Firm Commitment
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. Application Exhibits. Required architectural/engineering/cost related exhibits as listed in Appendix 5, Section A.5.4.3 must be submitted at the time of Firm Commitment Application.
B. Attachments to Firm Commitments. For Section 223(f) applications with no new tax credits, the scope of work for any repairs and alterations may be described by attaching to the Firm Commitment the printed results of the Lender’s 223(f) Repairs & Alterations Cost Worksheet along with the printed lists of repairs and alterations from the approved CNA e-Tool. When a detailed construction schedule is required, it too should be attached. If plans and specifications and AIA contracts exist, they should be referenced but not attached.
C. Title Surveys and Reports. For specific survey requirements, see Appendix 5, Section A.5.1.11.
Get a plain-English answer with a citation back to this text.
Ask AI about this code