9.5.2.3 Mortgage Credit

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. The HUD Underwriter shall determine escrow, performance and bond payment requirements. The cost of the mitigation work based upon the estimated cost from the contractor may be included in the insured loan. The amount of the escrow or bond shall be at least 150% of the total of the estimated cost of the mitigation work. The cash requirements for the escrow or bond, and the Lender and Mortgage Credits procedures for administering the escrow, shall be in accordance with existing closing instructions in the Chapter 19 of the MAP Guide. Higher escrow or bonding requirements will be necessary if Multifamily Regional staff and/or the REO/FEO determine that there is a greater than average risk that unforeseen problems may arise, resulting in increased cost based on previous experience with similar

MAP Guide, March 2021 Go to beginning of Chapter 9

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Chapter 9 Page 9-25

To return to this page after clicking a link, press ALT + Back Arrow

Chapter 9 Environmental Review and Requirements 9.5 HUD Responsibilities when Projects Require Remediation

Go to Table of Contents

work and/or research through local environmental remediation contractors about their experience in containing the cost within their stated estimate.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.