19.3.1.4 Prerequisites for Final Closing
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. Prior to final endorsement of the Note, the RC Director will confirm the following:
Construction has been completed (except as otherwise provided in this Chapter);
The RC Director has approved the Cost Certification , if applicable;
The RC Director issued the Maximum Insurable Mortgage (form HUD-92580) to the Lender; and
The HUD Closing Attorney has reviewed and approved the Final Closing package, including evidence of updated title insurance and an as-built survey.
Continue researching
Related topics
State and federal sources. Edit the document title or filters, then run your search.
Get a plain-English answer with a citation back to this text.
Ask AI about this code