Skip to content

12.8.2 Change Order Classification

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

  • A. Necessary. Necessary changes (which the CA or designee must document) are those that arise from:
  1. Latent conditions that differ from conditions defined by the construction documents;

  2. Changes in the applicable state or local codes, ordinances, etc. after:

  3. Initial closing for insured advances; or

Firm Commitment for insurance upon completion.

  • The Architect’s errors or omissions.

  • Damage to completed construction.

  • B. Betterment. Betterment changes are those that are economically justified. They must either:

  1. Increase net income;

  2. Reduce long-term project maintenance and/or operating expenses; or

  3. Otherwise enhance the mortgage security.

  • C. Equivalent. Equivalent changes are those proposed because:
  1. A specified item is not readily available, and the substitution provides equivalent or better utility and performance; or

  2. The proposed substitution reduces the contract price but provides equivalent or better utility and performance.

MAP Guide, March 2021 Go to beginning of Chapter 12

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Chapter 12 Page 12-22

To return to this page after clicking a link, press ALT + Back Arrow

Chapter 12 Construction Period 12.8 Change Orders – HUD Duties

Go to Table of Contents

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.