A.12.5.2 Problems Leading to Default

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. Construction problems due to:

  1. Work stoppage,

  2. Contractor abandonment of job,

  3. A change in the contractor, owner or Architect during construction,

  4. Construction defects untreated for 30 days, and

  5. Extended periods of bad weather, strikes, etc.

  • B. Financing problems due to:
  1. Contractor's inability to complete construction because of under financing.

  2. Cost overruns in carrying charges due to circumstances beyond the contractor's and Borrower’s control.

  3. Cost overruns in construction hard costs caused by:

    • Mandatory changes,
  • Voluntary changes, and

  • Price escalation.

  • C. Inadequate project income due to:

  1. Underestimated operating expenses,

  2. Overestimated rents and long-term occupancy levels, and

  3. or lack of initial operating deficit.

MAP Guide, March 2021 Go to beginning of Appendix 12

Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index

Appendix 12 Page A12-14

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 12 Construction Period A.12.5 Projects Experiencing Difficulties Before Final Closing

Go to Table of Contents

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.