Appendix 2 Quality Control Plans and Identity of Interest
Go to Table of Contents
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
| Category or Description of Cost | When Paid A B C D $ Before Endorsemen t (Note 1) $ After Endorsemen t (Note 2) $ Total Cost % of Total Cost |
|
|---|---|---|
| B. REPAIRS FEES 5. General Contractor (Note 4) a. Overhead $27,000 $27,000 0.99% b. Profit $270,000 $270,000 9.87% c. Subtotal GC Fees (5a + 5b) $297,000 $ 297,000 10.85% 6. Architect's Fees (Note 4) a. Design $30,000 $30,000 1.10% b. Supervision $15,000 $15,000 0.55% c. Subtotal Architect's Fees (6a + 6b) $30,000 $15,000 $45,000 1.64% 7. Other Fees (itemize, Note 3) $60,800 $325,000 $385,800 8. Total General Requirements + Fees $90,800 $657,600 $748,400 C. CALCULATIONS TOTAL 9. TOTAL COSTS $102,600 $3,361,600 $3,464,20 0 10. Total Cost per Unit (Line 9, col. C /# units; Note 5) $21,123 D. MISC. CALCULATIONS 11. Assurance of Completion % (10% of After Endorsement Total Cost, i.e., Line 9, col. B) $336,160 |
||
| 11. |
MAP Guide, March 2021 Go to beginning of Appendix 5
Bookmarked Version
Appendix 5 Page A5-76
Go to Acronym and Abbreviation List, Glossary, Index
To return to this page after clicking a link, press ALT + Back Arrow
Appendix 5 Architectural and Construction Analysis A.5.12 223(f) Repairs and Alterations Cost Worksheet
Get a plain-English answer with a citation back to this text.
Ask AI about this code