Appendix 2 Quality Control Plans and Identity of Interest

New Construction/Substantial Rehabilitation–Section 221(d)(4), 220, 231, and 241(a)…

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

Tab **No. ** Exhibit Name File Name Incl.
**N/A **
A. Hud-92264-T Rent Estimates for Low/Moderate Income 99264T ☐ ☐
Units, if applicable
2-2. Market Study MktRpt ☐ ☐
2-3. Environment Review
A. HUD Environmental Review Online System (HEROS) HEROS ☐
Submission Confirmation Email
B. Phase I Environmental Site Assessment (ESA) PhaseI ☐
C. Phase II ESA, if applicable PhaseII ☐ ☐
2-4. Capital Needs Assessment (CNA)
A. CNA e-Tool Submission Confirmation E-Mail eTool ☐
B. Relocation Plan, if applicable ReloPlan ☐ ☐
2-5. Architectural & Cost Analysis Report ArchCostRpt ☐ ☐
2-6. Engineer or SpecialtyReports,if any SpclRpts ☐ ☐
**Section ** 3: Management Agent
3-1. Organizational Chart (only if Identity-of-Interest) MgmtOrgCht ☐ ☐
3-2. HUD Management Forms
A. Resume of Management Agent including Schedule of MgmtRes ☐ ☐
Managed Properties
B. HUD-9832 Management Entity Profile 9832 ☐
C. HUD-9839-A, B, or C Certification 9839 ☐
D. Management Plan and Sample Lease MgmtPln ☐
E. Management Agreement MgmtAgmt ☐
F. Evidence of Fidelity Bond Insurance FidelityIns ☐
G. HUD-935.2A Affirmative Fair Housing Marketing Plan AFHMP ☐
(AFHMP)
3-3. Miscellaneous/Other Management Documents MiscMgmt ☐ ☐
Section 4: Property Documents
4-1. A. If Purchase:
1. Purchase & Sale Agreement with Amendments and SaleCtrt ☐ ☐
Extensions
B. If Purchased in the last 3 years
1. Purchase Contract or Settlement Statement RecntPrch ☐ ☐
2. Last Arm’s Length Certification LALStmt ☐ ☐
C. Certification of Outstanding Obligations/Existing CertOutOb ☐ ☐
Indebtedness
4-2. Title & Survey
A. Preliminary Tile Report Title ☐
B. Easement and Maintenance Agreements (Existing and EaseMainAgt ☐ ☐
Proposed)
C. ALTA/ACSM Land Title Survey Survey ☐
D. HUD-91073M Surveyor’s Report SurvRpt ☐
E. Location Maps and Photographs MapPhoto ☐
4-3. Evidence of Site Control (e.g. Deed, Lease) SiteCtrl ☐
4-4. Evidence of Zoning Compliance Zoning ☐
4-5. Multiple Services and Utility Assurance Letters (if New
Construction)
A. Electricity Electric ☐ ☐

MAP Guide, March 2021 Go to beginning of Appendix 4

Bookmarked Version

Appendix 4 Page A4-14

Go to Acronym and Abbreviation List, Glossary, Index

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 4 Application Processing Documents A.4.4 Sections 221(d)(4), 220, 231, and 241(a) Checklists

Go to Table of Contents

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.