Appendix 2 Quality Control Plans and Identity of Interest
Go to Table of Contents
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
| Category or Description of Cost | When Paid A B C D $ Before Endorsemen t (Note 1) $ After Endorsemen t (Note 2) $ Total Cost % of Total Cost |
|
|---|---|---|
| 12. 13. |
Total Amount of Repair Escrow (Line 9, col. B + Line 11, col. B) $3,697,760 Section 223(f) Cost Ceiling: (Sub Rehab Threshold Calculation) a. Enter Base $ Per Unit Limit: 15,933 b. Enter Local High Cost Multiplier: X 262% c. Adjusted Per Unit Limit: $41,744 Totalcost/ |
|
| Note 1: Mortgageable costs, reimbursable at Endorsement subject to available proceeds. Note 2: Mortgageable costs, reimbursable only from Repair Escrow. Note 3: Attach additional sheets as required. Note 4: % calculated (col. D) is fee divided by the sum of total Hard Cost (Line 3, col C.) and General Requirements. Note 5: Maynot exceed Section 223(f) Cost Ceiling amount (i.e.,Line13.c.,AdjustedPerUnitLimit) |
MAP Guide, March 2021 Go to beginning of Appendix 5
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Appendix 5 Page A5-77
To return to this page after clicking a link, press ALT + Back Arrow
Appendix 6 Energy Modeling and Water Conservation A.5.12 223(f) Repairs and Alterations Cost Worksheet
Go to Table of Contents
Get a plain-English answer with a citation back to this text.
Ask AI about this code