Appendix 2 Quality Control Plans and Identity of Interest

Project Structures Not Attributable Square Feet

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

Community Room 1,000sf
Commercial Space + 2,000sf
Athletic Club Building + 1,000sf
Total = 4,000sf
Project Structures Gross Square Feet
Gross Floor Area of Residential Structure + 50,000sf
Athletic Club Building + 1,000sf
Total = 51,000sf
Ratio:[4,000 sf] divided by [51,000 sf] = 0.0784 = 7.84%
D.Step 4.“As-Is” Not Attributable:
Total “As-Is” Value:
Residential Structure: $3,000,000
Athletic Club Building: + $50,000
Land (25,000 sf @ $20/sf): + $500,000
Total = $3,550,000
“As-Is” Not Attributable:
Total “As-Is” Value: $3,550,000
Ratio of Not Attributable (Step 3): x 7.84 %

MAP Guide, March 2021 Go to beginning of Appendix 5

Bookmarked Version

Appendix 5 Page A5-73

Go to Acronym and Abbreviation List, Glossary, Index

To return to this page after clicking a link, press ALT + Back Arrow Appendix 5 Architectural and Construction Analysis A.5.11 Costs Not Attributable for Existing Properties

Appendix 5 Architectural and Construction Analysis
Go to Table of Contents A.5.11 Costs Not Attributable for Existing Properties
[Total “As-Is” value] multiplied by [Ratio of Not
Attributable]:
=
**E.**Step 5.Total Cost Not Attributable:
“As-Is” Not Attributable (Step #4):
Rehab/Repairs Cost NotAttributable (Step#2):
+
[“As-Is” Not Attributable] plus [Rehab/Repairs Cost Not
Attributable]:
=
**F.**Step 6.Cost Without Fees:
Total Rehab/Repairs Cost (without Fees) (Step #1):
Total“As-Is”Value:
+
[Total Rehab/Repairs Cost] plus [Total “As-Is” Value]:
=
**G.**Step 7.The Percentage Not Attributable:
Total Cost Not Attributable (Step #5):
Cost without Fees (Step #6):
÷
[Total Cost Not Attributable] divided by [Cost without
Fees]:
=
**H.**Step 8.Rehab/Repairs Cost Not Attributable for Project
Total Estimated Replacement Cost of Project (Line G.74):
Percentage Not Attributable (Step #7)

MAP Guide, March 2021 Appendix 5 Go to beginning of Appendix 5 Page A5-74

Bookmarked Version

Go to Acronym and Abbreviation List, Glossary, Index

To return to this page after clicking a link, press ALT + Back Arrow

Appendix 5 Architectural and Construction Analysis A.5.12 223(f) Repairs and Alterations Cost Worksheet

Go to Table of Contents

[Rehab/Repairs Cost Not Attributable] plus [“As-Is” Not Attrib. Open-Air Parking Lot / Other Uses]:

=

$754,196

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.