Appendix 2 Quality Control Plans and Identity of Interest
A.5.9.2.2 Section 223(f) & 223(a)(7)
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. HUD cost review of Lender's Construction Analyst cost review report for firm exhibits, Section 223(f) & 223(a)(7):
HUD Office Name:
Firm Commitment Submission Date:
Project Name:
Project Location (City, State): MAP Lender Name:
- B. Summary of HUD cost review:
Firm Commitment deliverables. If not acceptable, indicate reasons.
Lender’s Capital Needs Assessment and Replacement Reserve Escrow (CNA) Report
Completed form HUD-92264 with signatures
HUD cost review. If not acceptable, indicate reasons.
- Examination of Lender’s CNA Report:
- Critical repairs to be completed before endorsement
MAP Guide, March 2021 Go to beginning of Appendix 5
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Appendix 5 Page A5-63
To return to this page after clicking a link, press ALT + Back Arrow Appendix 5 Architectural and Construction Analysis A.5.10 Costs Not Attributable for New Construction
Go to Table of Contents
- Non-critical repairs to be completed after endorsement and estimated repair costs
- Expected repair replacement and major maintenance items over a specified period of time
- Initial Deposit to Replacement Reserve, if any
- Monthly Deposit to Replacement Reserve
- Lender’s 223(f) Repairs & Alterations Cost Worksheet (See Appendix 5, Section A.5.12), per Chapter 5, Section 5.10.4.
Lender’s Property Insurance Schedule (form HUD-92329 from CNA e-Tool)
- C. I have reviewed the subject project and hereby make the following recommendation(s):
HUD Office Name: Project Name: Project Location (City, State): MAP Lender Name:
Get a plain-English answer with a citation back to this text.
Ask AI about this code