Appendix 2 Quality Control Plans and Identity of Interest
A.5.1.9 Privately Owned Offsite Water and Sewerage Systems
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
- A. Evidence of acceptable control are:
Certificate of Convenience and Necessity from the State Utility Regulatory Commission;
Franchise from local unit of Government;
Trust Deed;
Third Party Beneficiary Agreement; and
An incorporated non-profit owner’s association.
B. If control of continuity of service and the equitability of the service rate schedule is other than (a) above, all legal documents and other appropriate exhibits must be acceptable to HUD’s Counsel.
C. All community systems and privately-owned systems must meet local health authority or U.S. Environmental Protection Agency Maximum Contaminant Level (EPA MCL) standards.