Appendix 2 Quality Control Plans and Identity of Interest
A.5.7.3.11 Repair Replace Recommendation for Time to Complete
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. For refinancing applications proposing immediate repairs, repairs and alterations must be scheduled. Accordingly, the planned sequence and timing of immediate repairs should be described in the CNA e- Tool by using the “Time to Complete” entry, which should be a number of months (immediate repairs and alterations are those for which the answer to the question “when?” equals “now.”) The entered number of months to complete each task is reported on the List of Non-critical Repairs (as well as the list of accessibility repairs). Critical repairs that must be completed prior to closing should show “0” for the number of months entered as “Months to Complete.”
MAP Guide, March 2021 Go to beginning of Appendix 5
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Appendix 5 Page A5-48
To return to this page after clicking a link, press ALT + Back Arrow
Appendix 5 Architectural and Construction Analysis A.5.7 Capital Needs Assessments
Go to Table of Contents
Get a plain-English answer with a citation back to this text.
Ask AI about this code