Appendix 2 Quality Control Plans and Identity of Interest
WORKSHEET FOR SUM OF COSTS OF REPAIRS & ALTERATIONS IN 223(f) APPLICATIONS
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
(When hard costs exceed $15,000/per unit or include Level 2 or Level 3 Alterations)
Project Name: Honest Acres
# All Units: 164
Address/City/State/Zip:
FHA #:
| Category or Description of Cost | When Paid | C D $ Total Cost % of Total Cost |
|
|---|---|---|---|
| A B $ Before Endorsemen t (Note 1) $ After Endorsemen t (Note 2) |
|||
| A. REPAIRS HARD COSTS 1. Critical Repairs a. Life Safety (see CNA e-Tool list of repairs) b. Accessibility (see CNA e-Tool list of repairs) c. Subtotal All Critical 2. Non-critical Repairs (see CNA e-Tool list of repairs) 3. Total Hard Costs 4. GC's General Requirements (itemize, Note 3) |
$7,600 $4,200 $117,000 |
$7,600 $121,200 $128,800 $2,587,000 $2,715,800 $20,600 $2,736,400 |
|
| 1. 2. 3. 4. |
|||
| $11,800 $117,000 $ 0 $2,587,000 |
|||
| $11,800 $2,704,000 $20,600 |
MAP Guide, March 2021 Go to beginning of Appendix 5
Bookmarked Version Go to Acronym and Abbreviation List, Glossary, Index
Appendix 5 Page A5-75
To return to this page after clicking a link, press ALT + Back Arrow Appendix 5 Architectural and Construction Analysis A.5.12 223(f) Repairs and Alterations Cost Worksheet
Get a plain-English answer with a citation back to this text.
Ask AI about this code